WATER SHED PROGRAMME
Methodology adopted for Work :
All the responsibility about the water harvesting structure e.g.
planning, execution and maintenance rests with the user group. the
user groups from the very beginning i.e. selection of site and such
other decision were taken by themselves. Members were to decide about
the labours, quality and rate of materials like sand, stone, cement
etc. about selection of mason and were to decide about such related matters. If
the quality of material was found substandard, the material was
rejected by the members of the groups. The project staff continuously
supervised the works and gave technical guidance, moreover the
payments were being made by the office staff in the presence of the
members of the user groups.
Methodology adopted for
participation :
In all cases, people's contribution was credited in the form of cash only.
After the formation of groups, if the proposed site is feasible according to
the technical point of view Rs. 3000/- as taken as an advance amount from
the group. After technical survey the group was informed to credit 15%
amount of the estimated cost of the structure and after receiving 15%
people's contribution in cash the actual work on the site was started.
The methodology for collecting the peoples contribution by the user groups
were on the following basis. Collection may be :
1. Per acre of the benefited area.
|
|
OR 2. Per member of the user group. |
|
OR 3. Per well and bore well benefited
by the work. |
|
OR 4. According to the distance,
whether bore OR well is nearer or far away from the structure. |
|
OR 5. Per member of the group which may
very according to the economic condition of the members. |
|
OR 6. All the farmer families of the
village contribute equally whether they were benefited or not. |
Fruitful results of
participatory system :
By handling over the work to the user
groups, their understanding, strength and Skill were utilized in the work
and the quality and stability of the work had become better due to the
feeling of the people that the work was their own. Also the works were
accomplished in less expense as compared to Govt. SOR.
Some abstracts have been derived from the incidences that occurred while
carrying out the works, some of them are given below.
|
(1) |
Some members of user groups carrying
out this structures work has given their own valuable cultivated land
of about half an acre without any expectation of taking any
compensation for it.
|
| |
This has happened due to the
participatory method of the works.
|
|
(2)
|
In many of the construction works the
members of user groups had provided needed water without taking any
monetary charge for it.
|
| |
if both the above incidences an
individual has sacrificed his personal interest for the interest the
community.
|
|
(3)
|
Subscribing the magazine related to
agriculture and animal husbandry by the user groups. |
|
|
|